News of group

18.05.2022

SUCCESSFUL DRILLING OF WELL No. 11 DIBROVSKAYA


Drilling of well No. 11 DIBROVSKA with a depth of 1210 m began in April and was completed in May 2022. Based on the results of the well tests, an industrial gas inflow was obtained.



Back to the list