News of group

28.02.2023

SUCCESSFUL DRILLING OF WELL NO. 9 GRABINSKA


GEO-NADRA-INVEST LLC has successfully completed drilling and testing of wells No. 9-GRABINSKA. Drilling of well No. 9 at Grabinska began in November and was completed in December 2022. Based on the results of the well tests, an industrial gas inflow was obtained.



Back to the list